Temp Power Systems

Temp Power Systems has filed 2 building permits in San Diego since 2019, closing 50% of 2 rated permits. 1 permit remains open.

Also listed as: TEMP POWER SYSTEMS (36 permits)
50%
-16.7 vs 67% median
2
Construction Permits
1
Currently Open
2
Rate-Eligible
permits > 1yr old
2019–2020
Years Active

Closure rate based on permits older than 1 year. “Issued” and “Stop Work” statuses are excluded.

Performance by Permit Type

Electrical1 rated

100.0% closed vs 71% median, 29.2 points higher

Building1 rated

0.0% closed vs 57% median, 56.5 points lower

Median based on all applicants with 20+ rated permits in each category. Only permits older than 1 year are rated.

Year-by-Year Summary

2020

0.0%
Open1
Closed0

0 closed / 1 rated

2019

100.0%
Open0
Closed1

1 closed / 1 rated

All Permits

2 permits
StatusPermit #AddressIssued
OpenPMT-30765655305 Aurora Summit Trails, #TP1Aug 25, 2020
ClosedPMT-30276314560 Mission Gorge Pl, San DiegoJan 25, 2019

See Other Applicants