Blue Stone Construction
Blue Stone Construction has filed 7 building permits in San Francisco since 2019, closing 86% of 7 rated permits. 1 permit remains open.
86%
7
Construction Permits
1
Currently Open
7
Rate-Eligible
permits > 1yr old
2019–2021
Years Active
Closure rate based on permits older than 1 year. “Issued” and “Stop Work” statuses are excluded.
Performance by Permit Type
Building3 rated
66.7% closed vs 76% median, 9.5 points lower
Electrical2 rated
100.0% closed vs 88% median, 12.5 points higher
Plumbing2 rated
100.0% closed vs 81% median, 19.0 points higher
Median based on all applicants with 20+ rated permits in each category. Only permits older than 1 year are rated.
Year-by-Year Summary
2021
0.0%
Open1
Closed0
0 closed / 1 rated
2019
100.0%
Open0
Closed6
6 closed / 6 rated
All Permits
7 permits
| Status | Permit # | Address | Issued▼ | |||
|---|---|---|---|---|---|---|
| Open | 202104239226 | otc alterations permit | 308 24th Av, San Francisco | Apr 23, 2021 | — | $5,800 |
| Closed | PP20190429329 | Plumbing | 678A 11th Av, San Francisco | Apr 29, 2019 | — | — |
| Closed | PP20190429330 | Plumbing | 515 Munich St, San Francisco | Apr 29, 2019 | — | — |
| Closed | E20190429905 | Electrical | 678A 11th Av, San Francisco | Apr 29, 2019 | — | $0 |
| Closed | E20190429907 | Electrical | 515 Munich St, San Francisco | Apr 29, 2019 | — | $0 |
| Closed | 201903084746 | otc alterations permit | 515 Munich St, San Francisco | Mar 29, 2019 | — | $28,000 |
| Closed | 201709117557 | additions alterations or repairs | 678A 11th Av, San Francisco | Feb 26, 2019 | — | $21,603 |