Sheldon Terrace Phase 2
95 addresses with 192 permits
192
Total Permits
7
Open Construction
96.4%
Closure Rate
10
Applicants
Sheldon Terrace Phase 2 in Elk Grove has 192 construction permits across 95 addresses. 96.4% of rate-eligible permits have been closed.